Skip Navigation
Welcome to Tewksbury, Massachusetts


This table is used for column layout.
Town Resources
Quick Links
Subscribe to E-Alerts
Send Us Comments

Water Main Replacement
East Street Water Main Replacement (Maple Street to Andover Town Line) - Estimated timeframe for Construction is between August to November 2012
This project is to include the upgrade in the water main size along East Street between Maple Street to the Andover Town Line.  The approximate length of this upgrade is 4,500 linear feet and the main size will increase from the existing 8 inch diameter main to a 12 inch diameter main. Click here for a notice containing general information, as of September 18, 2012.